Submittal Pack
Diamond Deck scaffold toeboard bracket. Diamond Deck, by Diamond Scaffold Services.
Revision date: 2026-10-30
Download PDF1. Product Data
A steel toeboard bracket that clamps to a vertical scaffold tube and holds two toeboards in adjustable pockets. No tie wire or nails, and no changes to the scaffold.
| Material | Steel |
|---|---|
| Toeboards | 2x4 dimensional lumber or metal toeboards |
| Arm Length | about 6-1/4 in |
| Board Pocket | about 2 x 2 x 2 in |
| Adjustment | at least 180 degrees, plus independent coupler rotation |
| Patent Status | U.S. Patent Pending |
2. Components
- Tube Coupler
- A C-shaped clamp with a clamp screw grips the vertical scaffold tube.
- Two Bracket Arms
- Arms of about 6-1/4 in end in pockets sized for 2x4 lumber, about 2 x 2 x 2 in.
- Set-Screw Pockets
- A set screw locks each board in its pocket.
- Pivot Lock
- A pin-and-sleeve pivot sets the arms straight, at a 90 degree corner or any angle, then locks.
- Wood or Metal Boards
- Takes standard 2x4 lumber or metal toeboards. No changes to the scaffold.
- U.S. Patent Pending
- An application covering the bracket, its adjustable pivot and the installation method is on file.
3. Applicable Standard
29 CFR 1926.451(h)(4). OSHA does not approve or certify products; the employer remains responsible for compliance on site. Mixing components from different manufacturers is governed by 1926.451(b)(10).
- 50 lb: Force it must withstand, downward or horizontal, at any point1926.451(h)(4)(i)
- 3-1/2 in: Minimum height from the platform to the top edge1926.451(h)(4)(ii)
- 1/4 in: Maximum clearance above the walking surface1926.451(h)(4)(ii)
- 1 in: Largest opening allowed in the board1926.451(h)(4)(ii)
- Toeboards must be securely fastened in place at the outermost edge of the platform.
4. Installation
- Clamp. Tighten the coupler onto the vertical tube at deck level.
- Set the Angle. Swing the arms straight for a run or square for a corner, then lock the pivot.
- Drop In the Boards. Seat the toeboards in the pockets and snug the set screws.
Install toeboards after decking, before work starts, per the scaffold's competent person.
5. Testing and Documentation Status
| Toeboard Standard | Designed to the toeboard requirements of 29 CFR 1926.451(h)(4). Load testing in progress. In Progress |
|---|---|
| Professional Engineer Review | Professional Engineer review in progress. In Progress |
| Scaffold System Fit | Fit testing on major tube scaffold systems is in progress. In Progress |
| Finish | Steel with a high-visibility orange coating. In Progress |
| Patent | U.S. Patent Pending Available |
Test reports, the engineering letter and a HazCom article statement will be added to this pack as they are issued.
6. Contact
Diamond Scaffold Services, Bogalusa, LA and Athens, TN. (251) 443-7474.